Camax stock and supply Elster A’s in either 5A Current Transformer Connection or A Direct Connection. This document is intended as a guide to help Suppliers of Elster Metering Systems Your Elster A Meter has been chosen by your Service Provider to . A Three-phase CT Meter available at MWA Technology. Speedy delivery from direct Rating. A, Elster three phase electricity CT meter, 5/10/ A.
Author: | Dotilar Kazrashicage |
Country: | Kuwait |
Language: | English (Spanish) |
Genre: | Life |
Published (Last): | 26 January 2006 |
Pages: | 470 |
PDF File Size: | 14.25 Mb |
ePub File Size: | 3.7 Mb |
ISBN: | 384-3-59965-418-6 |
Downloads: | 22845 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Mazubei |
Select your preferred way to display the comments and click “Save settings” to activate your changes. Direct Connected Maximum current Imax shall preferably be an integral multiple of Ib. Fully insert cables into the terminals so that the insulation butts up into the counter-sunk recesses in the bottom face of the terminal block.
Table of Contents Add to my manuals Add. We aim to process all orders we receive within eltser to 3 working days, however from time to time we do have an increased demand for certain products or there might be delays from the manufacturer.
Select the appropriate meter variant only. After a short time the screen opposite is displayed. Enter text from picture: Alternatively the data can be exported in a file format that is suitable for being transferred into an MV90 system.
Introduction Communications are provided via the optical IEC port and are supported by data stream mode, allowing fast reading of meter data. Switching Times There may be special days in the year when the tariff does not follow the normal pattern, e.
Warnings Elster Metering Systems would like to draw the user’s attention to the International Standard for Lithium Batteries – IEC – which gives further information about the handling, storage, transport and disposal of lithium cells. Daylight Savings A11140 meter has the facility to have a different switching program consisting of several switching times running on different days of the week. A new file with the following format must be loaded.
Elster A1140 User Manual
Appendix D – External Battery Module External Battery Module power will be removed from the meter if the ‘No button time-out’ programmable from 10 to seconds using the Power Master Unit has expired. It allows Meter Connection information, Identifiers and Security information to be configured.
If the terminal cover plate is not in place, all supplies to the meter must be isolated. Note — If this option is used, old readings are stored in the database and new readings are appended.
There’s some good tutorial stuff on the MagPi web site https: I’ve given up trying. It should be simple enough a11440 record my single phase consumption elstfr part of the Emonpi worksrecord my generation, and derive import and export arithmetically.
Frequency Phase A Don’t have an account? Installation Check that there is no movement or loose parts within the meter enclosure. Each meter will require a two-way RJ11 adaptor to link to the next meter in the chain. This manual is for use with the A meter and the A load profile meter only.
Elster A Single/Three Phase Smart Meter
Rename the scheme and press Enter. Elster Metering Systems holds on record the appropriate Declaration of Conformity and supporting documentation, against which the CE mark is affixed.
Test Indication manufacturing Option Readings The A can be programmed to record up to four values from any of the rising demand registers at the end of each integration period. Up to days of 30 minute data can be stored for a single channel.
Meter Constants Retransmit is selected along with the appropriate Source, Pulse value and the Pulse width. Select Compatibility on the Main Menu Bar. This is achieved by copying a Meter and a Scheme into the Meter list. You have no items in your shopping cart. It is recommended that the database is backed up at least once a week and that the files are stored on a separate computer. Auto-cycle At power up the segment test pattern is shown.
Elster A MID CT Connected Polyphase Electronic meter with Pulse and Import/Export (UK)
External Battery Module power will be removed from the meter if the ‘No button time-out’ programmable from 10 to seconds using the Power Master Unit has expired. The Elster A is also MID-approved and highly accurate so the user can have complete confidence in all the readings whilst benefitting from the clear, 8-digit, LCD display for local access and data recording.
This manual supports A and A meters only. The internal clock with battery back-up ensures that recordings are accurately timed and the comprehensive security measures make sure that information is correct.
When you have chosen the folder: The RJ11 socket provides optional RS communications allowing remote access to the same data as the optical port. Communications are provided via the optical IEC port and are supported by data stream mode, allowing fast reading of meter data.
Tighten screws just sufficiently to prevent movement of the meter. See the list below for details of meter variants.
Both modems are housed in a secure carrier that fits under the meter terminal cover. IEC Port 3. JavaScript seems to be disabled in your browser. Safety requirements for meters are addressed in specific metering standards outlined below.
A1140 Three-phase CT Meter
Tariff Structure 8 Time-of-use TOU registers 4 Maximum demand registers 48 Switching times 6 Seasons 12 Change of season dates 32 Exclusion dates 13 End of billing dates Independent day control Daylight saving Deferred tariff Data Storage A Up to days of half hour data for one channel Programmable integration period Four channels of load profile storage for any measured quantity Instrumentation values Security The meter offers high security with many useful security features.
The measurement discrimination is such that, as the power factor of any load from 0. This Scheme may be used to program a number of different meters with the same Tariff and Display sequence.
An optional external battery that supports the reading of meter data and display facilities during power outages can be provided. Elster Metering Systems would like to draw the user’s attention to the International Standard for Lithium Batteries – IEC – which gives further information about the handling, storage, transport and disposal of lithium cells.